It’s a deal! INTRAKAT acquires AKTOR reshaping the landscape of the Greek construction industry 31.03.2023
East Med Gas Pipeline: “green light” but with extra conditions from the 4 Greek regions the pipeline will run through 22.03.2023
Greek railway: final works on the Athens – Thessaloniki line to be completed by the end of 2023 31.01.2023
The Ellinikon: plans for a new tram line inside the investment area & future connection with the metro 21.12.2022
The first hydrogen-powered bus will be put to the test on the street of Athens in less than a month 13.09.2022