One of the most discussed projects is the case of undergrounding of line 1 of the Metro in the section from Faliro to Piraeus. The project...
The giant competition for the recruitment of Technical Consultants of the Ministry of Infrastructure to run the new major infrastructure projects caused great interest. According to...
The ghost project for the Ioannina-Kakavia road axis is in a quagmire. Perhaps we are talking about the case of one of the most troubled projects...
The Ministry of Infrastructure and Transport is hiring a Technical Advisor to assist in the preparation and conduct of the major road project of the Chalkida...
The maturation of the large project for the construction of VOAK is underway with rapid steps. The axis that will run from Chania (from Kissamos in...
4 consortiums showed interest in yesterday’s competition for the Technical Consultant for line 4 of the Athens Metro. Attiko Metro has set a goal that the...
From the summer of 2022, the route Athens-Thessaloniki will be completed in less than 3 hours and 15 minutes. This important development is considered important by...
The projects that passed the door of the Recovery Fund for the Ministry of Infrastructure reach more than 2.5 billion euros, i.e. almost 15% of the...
The northern part of the E65 and the VOAK are finally the two major road projects that will pass through the door of the Recovery Fund....
The operation of the extension of line 3 from Nikaia to the Municipal Theater will begin in the summer of 2022 by Attiko Metro. According to...