Connect with us

News in English

Fraport’s masterplan for Greece’s 14 regional airports approved

Νίκος Καραγιάννης

Δημοσιεύθηκε

στις

The Ministry of Infrastructure finally approved Fraport’s masterplan regarding the necessary upgrade works that will be carried out by the new manager. This means that all construction sites will start operating soon, one after the other, signifying the beginning of the 340-million-euro worth projects, implemented by Intrakat contractor, that will have to be completed by Autumn 2021.

It is reminded that upgrade works concern the airports of Thessaloniki, Chania, Rhodes, Corfu, Mykonos, Santorini, Samos, Lesvos, Kos, Aktio, Kefalonia, Skiathos and Zakynthos.

According to Fraport’s estimations, some 600 new jobs are going to be created during the process. The new image of regional airports’ terminals stands out and will be achieved with the construction of new facilities in 5 cases (Thessaloniki’s Makedonia Airport is also included), whereas another 5 will be upgraded and expanded and the remaining 4 will be redesigned and modernized.

Interestingly enough, 2016 figures show that Fraport’s 14 airports, recorded a satisfying traffic of 25mn passengers (when they were still state operated). This figure is larger than Athens Airport traffic, which recorded last year, 20mn passengers. For 2017, the increase continued for the first 8 months, with +10.4% (or +1.85mn passengers), which is analyzed to 12.5% ​​for international flights and 4.3% for domestic flights.

With regard to Fraport’s flagship airport, “Makedonia” of Thessaloniki, it seems that there are expectations for its transformation into a large metropolitan airport. A downside is the expedient nature for the completion runway’s 10-28 upgrade work and, as the Minister of Infrastructure, Mr. Sprintzis said in his interview yesterday, there is a cooperation with the concessionaire to find the optimal solution that will allow projects to complete in a short time and the airport to operate as smoothly as possible. However, the issue is expected to be resolved in the coming days.

 

Nikos Karagiannis-ypodomes.com

Follow Nikos Karagiannis on Twitter

image_pdfimage_print
συνέχεια ανάγνωσης
Advertisement

News in English

Technical offer for Hellinikon casino project, approved

Νίκος Καραγιάννης

Δημοσιεύθηκε

στις

Καζίνο Ελληνικό Mohegan ΓΕΚ ΤΕΡΝΑ

Α step forward has been taken in the case of the casino in Elliniko since, as it became known, the technical offer of Mohegan-GEK TERNA consortium was approved by the Gaming Supervision and Control Committee (EEEEP), which is also the finalist for this large-scale project.

What remains now is the award of the tender, a step which is currently unknown when it will take place due to the pending case of Hard Rock International’s appeal to the Council of State. It is reminded that the American company made this move despite the repeated negative decisions for it in this tender, due to the rejection of its offer.

The completion of the tender for the Integrated Resort Casino (IRC), is a basic deferral condition for the initiation of the project in Elliniko, which means that the relevant contract must first be signed in order for the signatures concerning the large investment in the spaces of former international airport to be completed.

Inspire Athens

The official name given by Mohegan-GEK TERNA consortium is “Inspire Athens” and is a mega-project, in fact the largest building project in Greece, while for GEK TERNA will be a top addition to the portfolio of projects that implements.

“Inspire Athens”, the first integrated tourist complex with casino in Greece, consists of a luxury hotel, entertainment venues, conference center, shops, restaurants, as well as a complete range of high quality services. The project will help to inaugurate a new era of touristic development and economic prosperity for Greece and the whole region.

The flagship design of the building is a creation of the international architectural firm Steelman Partners, which specializes in the design and construction of IRC complexes.

image_pdfimage_print
συνέχεια ανάγνωσης

News in English

Shift2Rail approves €75.4m funding for 19 projects

ypodomes team

Δημοσιεύθηκε

στις

από

Σιδηροδρομικό έργο

The Shift2Rail (S2R) joint venture (JV) has announced that it will provide up to €75.4m in funding for 19 projects worth a total of €147.7m under the 2020 call for proposals for research and innovation (R&I) activities.

S2R members will undertake eight projects worth €127.7m, with the JV providing €55.4m in funding. An additional 11 open call projects worth €22m have been approved, of which up to €20m will be funded by S2R.

A total of 242 participants will be involved in the projects, with 29% of these small and medium enterprises (SMEs).

S2R received 43 requests for a combined €113.3m in funding in the call for proposals, which was around 50% more than the funding available.

“This is an important transition moment for S2R and the rail research and innovation community at large,” says S2R executive director, Mr Carlo Borghini. “These new projects are our ticket to moving into the successor programme and beyond R&I to market uptake of our forward-looking solutions.”

S2R has invested its full budget of €400m over the past four years, resulting in the launch of research worth an estimated €1bn. Last year, S2R published the inaugural edition of its Catalogue of Solutions, which offers railway executives and buyers a clearer picture of what the rail solutions of the future will look like.

 

Source: railjournal.com

image_pdfimage_print
συνέχεια ανάγνωσης

News in English

Pyrgos-Kalo Nero road project in Western Peloponnese, signed

Νίκος Καραγιάννης

Δημοσιεύθηκε

στις

Εργασίες ασφαλτόστρωσης οδοστρωτήρας

The important road project concerning the upgrade of road safety on Pyrgos-Kalo Nero axis was signed. The contractor of the project is ODOS ATE with a discount rate of 46.53%. It is a 54 km long interregional project. which includes works in both the Prefecture of Ilia and of Messinia, improving the characteristics of the existing section and increasing the level of road safety. The contracting authority is the Ministry of Infrastructure and Transport.

The project was signed on July 23 at the Ministry of Infrastructure and Transport, in Papagou. The initial cost of the project reached 19.8m euros (VAT incl., excl. VAT: 15.96m euros). The auction of the project took place on September 12 and the unsealing of the offers on September 18, 2019. A total of eight companies participated.

The duration of the contract is 730 days, i.e. 2 years. According to rough calculations, the projects, if there aren’t any delays during the construction period, will be completed in the middle of 2021.

The financing of the project will be covered by the NSRF 2014-2020 and more specifically by the O.P. YME-PERAA. It is reminded that Pyrgos-Kalo Nero was part of Olympia Odos until 2013. Then in the famous “restart”, the whole section from Patras to Tsakona was out of the scope of the project. This section also includes the area of ​​Kaiaphas, which has been designated as Natura.

The scope of the project is the implementation of short-term interventions in order to improve road safety featured on the road section of National Road 9 (National Road 9: Patra-South Messinia) “Pyrgos-Kalo Nero”, with a total length of 54 km, in the Regional Units Ilia (42 km) and Messinia (12 km).

image_pdfimage_print
συνέχεια ανάγνωσης

Facebook

Ετικέτες



δημοφιλη θεματα